Inspection arranged with the on-site manager to decide best method for cleaning complete face of building.


Issues/Problems to be solved:
Time was the main factor involved, from the first telephone call to arrange the inspection, issuing quote and completion of work all had to be done within 48 hours due to the televising of the World Opera Championships on the Friday.


What we did:

1              Arranged thorough inspection of the premises with the On-Site Manager.
2              Sent through a written quote, stating a confirmed time for the start and completion of the work.
3              Arranged for four men, boom lifts and cleaning equipment to be on site for 6.30pm on Thursday evening (so as to minimize the amount of disruption to the public) due to the location being in the centre of Cardiff.
4              Using a combination of High Powered Pressure Water equipment and APT environmentally friendly products set to work.
5              Work completed by 4am on the Friday Morning, allowing enough time for the management to erect the necessary banners before the filming started.

Result:

The work was completed well within time with some amazing results.


Testimonial

“In these days of constrained budgets I thought it impossible to give the external façade the required face-lift, with minimal funds and time at my disposal (before hosting the nationally televised BBC Cardiff Singer of The World competition) and both you and your team’s effective and sympathetic approach to the workload (working over night and amongst the fabric of our large canvas advertising hoarding) delivered a 100% satisfactory job!”