of work soda blasting
Name and Location of Project - Barclays
Bank Bridgend
Client details - Overbury plc
Location – Bridgend
Nature of the project- Task
To
carry out various works on the bank as part of the refurbishment programme,
carrying out the sensitive stone cleaning to remove pollution and surface build
up to the exterior of the front elevation without damaging natural Portland
stone face and the terrazzo detailed columns.
Remove
exterior street accessed night safe and replace with new special stone matching
pieces.
Remove
and adjust existing oak framed window above the ex night safe to match
corresponding windows.
Repair
lime plasterwork - ornate to internal surfaces and make up and install new carpentry
to the ground floor to match previous material.
The suggested improvements
To
use soda blast method cleaning using a Vortex II nozzle n03 at low pressure 3-4
bar to remove natural skin covering and dark ingrained pollution.
To
enhance visual appearance, refit new stonework to match existing, break out and
splice in new oak pieces to window frames and surround.
What We Did
We carried out a survey with the Overbury project manager at short made several recommendations to save costs of the refurbishment as described above sourcing local supplies of materials.
We carried out a survey with the Overbury project manager at short made several recommendations to save costs of the refurbishment as described above sourcing local supplies of materials.
Task
It
was a busy centre of town location so had to liaise with site manager the best
site management to ensure safety to pedestrian and other contractors.
We
carried out a sample of the soda blasting and the client approved the finish.
We then carried out the works outside of opening hours starting with the outside
facade soda blast cleaning.
We
arranged the internal works to correspond with the delivery of the specialist
materials and the client’s very short works programme and the removal and
installation of the secured night safe.
Client Testimonial
I
would like to thank APT for their excellent work and assistance on the Barclays
project, they delivered the project and additional works on time and without
issue. I would like to thank Andrew and his team for all the extra effort they
went to. I look forward to using them on future renovations.
Graham Lowe
Project Manager, Overbury
Other comments.
There
were obstacles regarding constant movement other contractors to be considered
these were overcome by implementing a detailed but flexible approach.