Case Study Barclays Bank Soda Blasting

CASE STUDIES - soda blasting and repairs please add to apt ss website e also
Add photos File and to complete slide show
Add Videos
Product links - Category of work soda blasting
Name and Location of Project - Barclays Bank Bridgend
Client details - Overbury plc
Location – Bridgend

Nature of the project- Task
To carry out various works on the bank as part of the refurbishment programme, carrying out the sensitive stone cleaning to remove pollution and surface build up to the exterior of the front elevation without damaging natural Portland stone face and the terrazzo detailed columns.
Remove exterior street accessed night safe and replace with new special stone matching pieces.
Remove and adjust existing oak framed window above the ex night safe to match corresponding windows.
Repair lime plasterwork - ornate to internal surfaces and make up and install new carpentry to the ground floor to match previous material.

The suggested improvements
To use soda blast method cleaning using a Vortex II nozzle n03 at low pressure 3-4 bar to remove natural skin covering and dark ingrained pollution.
To enhance visual appearance, refit new stonework to match existing, break out and splice in new oak pieces to window frames and surround.  

What We Did
We carried out a survey with the Overbury project manager at short made several recommendations to save costs of the refurbishment as described above sourcing local supplies of materials.

Task
It was a busy centre of town location so had to liaise with site manager the best site management to ensure safety to pedestrian and other contractors.
We carried out a sample of the soda blasting and the client approved the finish. We then carried out the works outside of opening hours starting with the outside facade soda blast cleaning.
We arranged the internal works to correspond with the delivery of the specialist materials and the client’s very short works programme and the removal and installation of the secured night safe.

Client Testimonial
I would like to thank APT for their excellent work and assistance on the Barclays project, they delivered the project and additional works on time and without issue. I would like to thank Andrew and his team for all the extra effort they went to. I look forward to using them on future renovations.

Graham Lowe    
Project Manager, Overbury



Other comments.

There were obstacles regarding constant movement other contractors to be considered these were overcome by implementing a detailed but flexible approach.